The items you will need to build this first step are: x1 Elbow (672-504HC), x1 Side Outlet Tee (671-604HC), x1 Double Swivel Socket (676-704HC), x2 Single Swivel Socket (677-304HC), x1 24” Non Threaded Pipe, x1 36” Non Threaded Pipe, x2 60” Non Threaded Pipe.
Take the 36” pipe and slide the middle hole of the Double Swivel Socket (676-704HC) until centered then tighten set screws. Attache an Elbow (672-504HC) to the top of 24“ pipe then tighten set screw.
Take the 24” pipe and slide the middle hole of the Side Outlet Tee (671-604HC) until centered then tighten set screw.
Attach the bottom of a Single Swivel Socket (677-304HC) to each end of the 24” pipe then tighten set screws.
Take the 36” pipe and slide the bottom of the pipe into the vertical hole of the Side Outlet Tee (671-604HC), attached to the 24” pipe, then tighten set screw.
Slide each 60” pipe through the open hole of the Single Swivel Socket (677-304HC) and into the open holes of the Double Swivel Socket (676-704HC) then tighten set screws.
Build this step twice for each leg.
Stage 2
Building Base
Take one of the 120” pipes and slide x8 Hook (678-204HC) on the pipe. You will want x4 Hooks (678-204HC) facing towards the right and x4 Hooks (678-204HC) facing towards the left. Space them accordingly then tighten set screws.
This is where you connect the two A frames together.
Take two 120” pipes and connect them together using the Elbows (672-504HC) and Side Outlet Tees (671-604HC) connected to the A frame. You want the pipe with the hooks on the top and the other pipe in the middle.
Stage 3
Attaching Targets
Its Time to hang your targets.
Chains and metal plated were used with this design but any type of target can be used.