Organize your garden with the outdoor Plant Hanger!
Skill Level
Estimated Cost
Estimated Time
Tools & Materials
SteelTek Supplies (3/4"):
(16) Gate Eye - (673-804HC)
(12) Hook - (678-204HC)
(4) Flange - (673-104HC)
(2) Elbow - (672-504HC)
(2) Three Socket Tee - (670-404HC)
(1) Side Outlet Tee - (671-604HC)
(1) Two Socket Cross - (671-904HC)
(1) 120" Non-Threaded Pipe
(3) 72" Non-Threaded Pipe
(2) 60" Non-Threaded Pipe
(1) 18" Non-Threaded Pipe
Other Supplies:
Screws (Specifically for what you are drilling into)
Tools:
(1) Allen Wrench - 6 Millimeters
Drill
How To
Stage 1
Legs
Start with building the legs.
Grab 3 72” pipes and attach like you see in the above diagram.
You will want to center the Three Socket Tees (670-404HC) on two pipes and the Two Socket Cross (671-904HC) on the other pipe and tighten the set screws.
Slide a Gate Eye (673-804HC) on each end pipe and finish 2 legs off with the Elbow (672-504HC) and tighten set screws. Center the Gate Eye (673-804HC) in between the Three Socket Tee (670-404HC) and Elbow (672-504HC) and tighten set screw.
Finish the middle pipe off with a Side Outlet Tee (671-604HC). Make sure the vertical hole is not being blocked and tighten set screws.
Attach Flanges (673-104HC) to the bottom of each pipe and tighten set screws.
Stage 2
Cross Beams
This step involves 1 10 ft pipe and 2 5 ft pipes.
Slide your fittings on in the order you see in above diagram and tighten set screws.
Make sure the fittings on the 10 ft pipe are set to the left side of the pipe and tighten set screws.
Stage 3
Attaching Middle Leg to Wall
Attach the Flange (673-104HC) to the wall. Make sure you measure appropriately.
Attach the Flange (673-104HC) and Side Outlet Tee (671-604HC) with an 18” pipe and tighten set screws.
Stage 4
Attaching Legs and Cross Beams
Take the 10 ft pipe built in Stage 2 and slide it into the vertical hole of the Side Outlet Tee (671-604HC).
Once the 10 ft pipe is centered tighten set screws. Place the fittings on the right hand side of the pipe as shown in above diagram and tighten set screws.
Attach the two 5 ft pipes built in Stage 2 to the Two Socket Cross (671-904HC)on the middle pipe and tighten set screws.
Attach the left support to the left side of the 10 ft and 5 ft pipe and tighten set screws.
Do the same thing on the left hand side and tighten set screws.