Measure the Flanges, place them in the appropriate areas and mark your screw holes.
Pre-drill screw holes and install flanges using wood screws.
Slide 36” pipe into each Flange then tighten set screws.
The two 12” pipes and attach a Three Socket Tee to each end of pipe as shown in above diagram. Make sure the Vertical holes are not being blocked then tighten set screws.
Take the 12” pipe with Three socket Tees and slide one down the left side and one down the rights side. Set to desirable height then tighten set screws.
Stage 2
Building Top
Take your 44” pipe and slide fittings on in this order: Hook, Three Socket Tee, Hook, Three Socket Tee, Hook, Three Socket Tee, Hook. Space evenly then tighten set screws.
Take your other 44” pipe and do the same thing.
Once assembled, take three 12” pipes and attach them to open ends of Three Socket Tees then tighten set screws.
Stage 3
Finishing Top
Take two 12” pipes and attach Side Outlet Elbows to each end as shown in above diagram. Make sure the vertical holes are not being blocked then tighten set screws.
Slide open horizontal Side Outlet Elbow holes onto open ends of 44” pipe. Make sure the vertical holes are not being blocked then tighten set screws.
Stage 4
Installing Top
Place the top built in Stage 3 onto the vertical pipes by sliding the bottom of the Side Outlet Elbows onto each pipe then tighten set screws.