Plant Hanger
Organize your garden with the outdoor Plant Hanger
Tools & Materials
SteelTek Supplies (3/4"):
- (16) Gate Eye - (673-804HC)
- (12) Hook - (678-204HC)
- (4) Flange - (673-104HC)
- (2) Elbow - (672-504HC)
- (2) Three Socket Tee - (670-404HC)
- (1) Side Outlet Tee - (671-604HC)
- (1) Two Socket Cross - (671-904HC)
- (1) 120" Non-Threaded Pipe
- (3) 72" Non-Threaded Pipe
- (2) 60" Non-Threaded Pipe
- (1) 18" Non-Threaded Pipe
Other Supplies:
- Screws (Specifically for what you are drilling into)
Tools:
- (1) Allen Wrench - 6 Millimeters
- Drill
How To
Step 1
Legs

- Start with building the legs.
- Grab 3 72” pipes and attach like you see in the above diagram.
- You will want to center the Three Socket Tees (670-404HC) on two pipes and the Two Socket Cross (671-904HC) on the other pipe and tighten the set screws.
- Slide a Gate Eye (673-804HC) on each end pipe and finish 2 legs off with the Elbow (672-504HC) and tighten set screws. Center the Gate Eye (673-804HC) in between the Three Socket Tee (670-404HC) and Elbow (672-504HC) and tighten set screw.
- Finish the middle pipe off with a Side Outlet Tee (671-604HC). Make sure the vertical hole is not being blocked and tighten set screws.
- Attach Flanges (673-104HC) to the bottom of each pipe and tighten set screws.
Step 2
Cross Beams

- This step involves 1 10 ft pipe and 2 5 ft pipes.
- Slide your fittings on in the order you see in above diagram and tighten set screws.
- Make sure the fittings on the 10 ft pipe are set to the left side of the pipe and tighten set screws.
Step 3
Attaching Middle Leg to Wall

- Attach the Flange (673-104HC) to the wall. Make sure you measure appropriately.
- Attach the Flange (673-104HC) and Side Outlet Tee (671-604HC) with an 18” pipe and tighten set screws.
Step 4
Attaching Legs and Cross Beams

- Take the 10 ft pipe built in Stage 2 and slide it into the vertical hole of the Side Outlet Tee (671-604HC).
- Once the 10 ft pipe is centered tighten set screws. Place the fittings on the right hand side of the pipe as shown in above diagram and tighten set screws.
- Attach the two 5 ft pipes built in Stage 2 to the Two Socket Cross (671-904HC)on the middle pipe and tighten set screws.
- Attach the left support to the left side of the 10 ft and 5 ft pipe and tighten set screws.
- Do the same thing on the left hand side and tighten set screws.
Step 5
Finished
