Side Table

Side Table

Skill Level
Estimated Cost
Estimated Time

Tools & Materials

SteelTek Supplies (1-1/4):

  • (8) 1-1/4" Flange: (673-106HC)
  • (4) 1-1/4" Side Outlet Elbow: (671-606HC)
  • (4) 1-1/4" x 26" Pipe
  • (4) 1-1/4" x 11" Pipe

Other Supplies:

  • (1) Wood Top: 14" wide x 14" long x 1" thick
  • (24) Wood Screws: 3/4" length, screw head must be #12 or higher

Tools:

  • (1) Allen Wrench: - 8 Millimeters
  • (1) Drill: for predrilling and securing SteelTek fittings to wood surfaces

How To

Stage 1

Brace Assembly

  • Gather the 11” lengths of pipe and Side Outlet Elbows together.
  • Slide each end of the 11” long pipe into the Side Outlet Elbows and lightly secure with the Allen Wrench.

Stage 2

Leg Assembly

  • Slide each 26” length of pipe into the vertical openings of the Side Outlet Elbows.
  • Lightly secure where you want the height to be.
  • At the base of each 26” leg, secure a Flange.

Stage 3

Final Assembly

  •  Place a Flange at the top of the 26” legs. Do not secure.
  •  Lay the table top where desired onto the legs with Flanges.
  • Mark with a pencil where to pre-drill.
  • Pre-drill where marked.
  • Take the top Flanges and secure them with the screws.
  • Lay the table top with the secured Flanges onto the top of the 26” legs.
  • Secure the top with the legs using the Allen Wrench.
  • Make sure all fittings are firmly secure with the Allen Wrench.

Steel•Tek Professional Tip

After pre-drilling, it would be a good idea to apply the finish to the wood top you have chosen or fashioned. This way you can avoid any scratches or other marks from showing on your table.